6.
3.
7 The top railing of the scaffold pole should be 1m higher than the upper end of the parapet wall and 1.
cuplock scaffolding bottom cup
5m higher than the upper end of the eaves.
.
6.
3.
7 The top railing of the scaffold pole should be 1m higher than the upper end of the parapet wall and 1.
cuplock scaffolding bottom cup
5m higher than the upper end of the eaves.
.