Scaffolding: Undervalued Spatial Structural Art – From the Perspective of Structural Logic, the Permanent Safety of Temporary Structures

The height of the sweeping pole exceeds the standard (the standard requires a distance of ≤ 200mm from the base surface), resulting in the formation of a “short cantilever” at the bottom of the upright pole, which causes significant lateral displacement under the first step of the frame load.

formwork prop nut

.

Leave a Reply

Your email address will not be published. Required fields are marked *