Who signs for scaffold acceptance, what is inspected, and how are traces left? Key points of whole process control!

In accidents such as scaffold collapse and falling from heights, “passing the inspection process” is a frequent reason for accountability.

There are many misconceptions on site: scaffolding workers say they are qualified and then put people on board, sign the acceptance form afterwards, only sign the name without checking the entity, and install in sections without conducting segmented acceptance.

Once the frame becomes unstable and an accident occurs, the personnel responsible for acceptance and signing shall bear the corresponding responsibility directly.

fabricated frame scaffold

.

Leave a Reply

Your email address will not be published. Required fields are marked *