Training on Operation Requirements and Safety Management for China Construction Scaffolding Engineering

Are you afraid of stepping on a pit when setting up scaffolding? This training is worth collecting.

Key points of the entire process of fastener type steel pipe scaffolding: Φ 48.

3 × 3.

6 steel pipe, torque of 40-65N · m; The 24m connecting wall piece is the watershed, and the width of the diagonal brace is not less than 4 spans of 6m; the overhanging end of the steel cantilever frame: anchoring end=1:1.

25, and the bolt protruding from the anchoring end is not less than 200mm; the dismantling must be done from top to bottom, and throwing of structural components is strictly prohibited.

Attached are real-life photos of common hazards on site for self inspection.

cuplock scaffolding manufacturers

Transfer to the brothers on the project, one less violation, one more point of safety.

.