There are two high-risk scenarios for scaffold accidents: one is the overall collapse of the scaffold due to instability, and the other is the fall of personnel from the edge opening.
To manage these two matters, it relies on the hierarchical control of the plan, disclosure, acceptance, and dismantling sequence, as well as the standard sealing of railings, cover plates, and protective doors.
This article combines these two lines together.
.