Skip to content
Skip to content

China Scaffolding News

Three construction workers fell and died, and the lifting platform of a project in Suzhou tilted when it was removed!

Posted on January 26, 2022 by China Scaffolding Manufacturer Blog

Source: Jiangsu construction management, CCTV news, Zhongcheng construction industry, National Standardization Management Committee, if necessary.

Cuplock System Scaffolding

Tagsscaffolding

What is the maximum control height and spacing for wall connecting components in practical use? How to set up the top-level homework layer?

Comparison of Four Common Scaffolding Technologies: Fastener type, Bowl type, Socket type Plate type, and Straight insertion type Plate

3D practice atlas! BIM practice model of construction technology of construction engineering, download the full version!

Construction of waterproof and leakage repair in Shaoguan_ Waterproof and leakage repair of Zhengzhou garage_ Quotation for Shaoguan

Calculation span of steel section for cantilever steel scaffolding

Earthwork construction scheduling daily report 2021.3.8

Three workers in Gansu fell from a construction platform more than 10 meters high

Deep learning of air duct design and installation construction (classic courseware)

Post navigation

Daily report of earthwork construction scheduling, December 2021 twenty-nine
Construction notice! It is expected to resume in April next year!

Recent Posts

  • Key points for the construction of China Construction’s cantilever scaffolding scheme (page 107)
  • Construction Plan for Suspended Scaffold (Download if needed)
  • [Hidden Danger Investigation] Scaffold Hidden Danger Investigation Atlas (II)
  • Comparison of Four Common Scaffolding Technologies: Fastener type, Bowl type, Socket type Plate type, and Straight insertion type Plate
  • Interpretation of the Specification for Fastener type Steel Pipe Scaffolding (Part 1)

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News