51 opportunities and 4 skills for construction claims!
51 opportunities for claim 1. 3、 Design change has potential claim opportunities 25) loss of manpower, materials and funds, work stoppage, delay in construction period,...
51 opportunities for claim 1. 3、 Design change has potential claim opportunities 25) loss of manpower, materials and funds, work stoppage, delay in construction period,...
Interleaved construction can reduce the number of simultaneous construction operations and the number of workers, reduce the proportion of labor cost in the total construction...
Zhuji branch: 0575-87558090, floor 7, Xiangxiang building, No. The director shall identify and pay attention to the official wechat official account of “Shengdu home decoration...
Electrical engineering construction procedure PPT, page 129. Lifting Anchor
The safety facilities at the equipment and material safety site shall be inspected and protected, especially the safety protection devices and facilities shall be inspected...
The installed anchor shall be level with the thermal insulation layer. (3) The number of anchors shall not be less than 5 per square meter,...
Click on the recent electronic version of one inch color photo on white background without hat (jpg or JPEG format, less than 30d). Mr. Straight...
Rebar Cross Chair Source: network click the 「 below 」. Please slow down the passing vehicles, and large vehicles should choose the way to detour...
In this case, the author understands and respects the court’s decision.. 938 civil ruling: the construction law of the people’s Republic of China does not...
The proportion of lotion is inappropriate and the content is too low. Apply batch scraping and rolling coating in one aspect, and use the same...