The construction site in Jiaozhou is dusty and noisy, causing people’s anger!
7 middle school (the former Jiaozhou Zhenhua middle school) was founded in 1975. the next day. Jiaozhou No. Jiaozhou No. and the sound of electric...
scaffolding
7 middle school (the former Jiaozhou Zhenhua middle school) was founded in 1975. the next day. Jiaozhou No. Jiaozhou No. and the sound of electric...
Friends of the general public: in order to implement the drainage channel in the western area of the urban health building and completely solve the...
Scaffolding Ringlock System Ledger End The pile driver is suitable for construction on land. Hydraulic excavator, suitable for the range with water depth less than...
On april20,2015, the court of first instance, based on the application of Qin Jianzhen, Weiqiang and hanxinping, entrusted the appraisal unit to appraise the project...
2. 2. There shall be no loose or dangerous rocks on the slope. 4. The roadbed must be uniform and dense, and the thickness of...
Taishi Minghua and his party successively came to the construction project site of Shuangliao Public Security Bureau’s business technology room and police sports training and...
The effective volume of the water tank can reach 5M3. The square tank body is equipped with a special sprinkler pump (which can be pumped...
The effective volume of the water tank can reach 5M3. Top mounting configuration: the tank body is made of high-quality 4mm thick carbon steel and...
Attachment: Standard for skilled workers on the construction site of housing construction and municipal infrastructure projects in Heilongjiang Province (Trial) Heilongjiang Provincial Department of housing...
Please forgive the inconvenience caused by vehicles and pedestrians passing by the nearby highway. In order to ensure the traffic safety of pedestrians and vehicles...