Waterproof construction process standard of basement side wall (I)
4. Process flow: base course treatment → brushing cold primer oil → additional layer construction → large surface construction of coiled material → protective layer...
scaffolding
4. Process flow: base course treatment → brushing cold primer oil → additional layer construction → large surface construction of coiled material → protective layer...
7. After the completion of waterproofing, the general contractor shall immediately organize the construction of waterproof protective layer. After the construction of self-adhesive coiled material,...
Large surface construction of SBS coiled material (1) if one layer of coiled material is used, the thickness shall not be less than 4mm, and...
On January 2, 2022, November 29 of the lunar calendar, weather: snow shower to cloudy, temperature: – 16 / 2 ℃, northwest wind level 3,...
Construction progress: the section from Hongchun Road station to Urban Construction Institute station: ① 2# connecting channel pump house, 1 steel grating is erected (6...
From 8:00 a.m. Erection Anchor One Sided In case of a traffic accident, call the police as soon as possible, select the quick compensation method,...
Today, I recommend a book for masters who really want to learn waterproof technology: the second edition of indoor water pipe leakage detection technology, which...
3. At the lap joint of new and old coiled materials, the original coiled material interface shall be cleaned, and the lap joint can be...
The details are as follows: I. During the period of road traffic control, please follow the on-site road traffic instructions… (2) Phase II: from January...
7. After completion, it shall be reported to the quality supervision station for special acceptance. 2、 Control standards and precautions 1. (long press the QR...