Tongcheng: Project builders strive to seize the golden period of construction
| Source: Tongcheng Rong Media Center | Editor in chief: Zhi Bai | Reviewed by: Yi Wei Crosses the River Click“. Anhui Wuzhou Design Packaging...
Ringlock scaffolding Manufacturer
News Ticker
| Source: Tongcheng Rong Media Center | Editor in chief: Zhi Bai | Reviewed by: Yi Wei Crosses the River Click“. Anhui Wuzhou Design Packaging...
The upper part is chiseled by air compressor, and the lower part is left with 10cm for manual chiseling. The open weld shall be repaired...
Scaffolding Screw Jacks The installation of elevators started without going through the construction application procedures and the steel structure was subcontracted to unqualified individuals, leading...
During the construction period, vehicles, non motor vehicle drivers and pedestrians who drive into the construction section should pay attention to the traffic signs and...
As of 24:00 on June 21, 435 projects in 16 districts of the housing construction system (not in Pinggu District) had been investigated, 743 people...
Erection Anchor After the final setting and hardening, the formwork can be removed! ▼ The completed large plate foundation is shown in the following figure:...
σ= Nl /Ac=10500/424=24.8N/mm2<0.85f =0.85 × 215=182.8N/mm2; The strength of the steel pipe connecting the wall meets the requirements. Under the joint work of M16 hexagon bolt and...
Socket Data Clip Long press the QR code to identify and contact us. The copyright belongs to the original author. Wechat official account and add...
For example, in the “appeal case of construction contract dispute between Ningbo Haichuan Electric Appliance Co., Ltd. Third, in principle, the exception should not be...
At about 23:20 on July 17, 2021, on the fifth floor of a main building project in Shenzhen, a worker with an electric trolley fell...