Notice on practical operation assessment of special construction operators (No. 29, 2021)
Please bring the original ID card to the designated place 10 minutes in advance (those who pass the theoretical examination can participate in the practical...
Ringlock scaffolding Manufacturer
News Ticker
Please bring the original ID card to the designated place 10 minutes in advance (those who pass the theoretical examination can participate in the practical...
Second, settle accounts according to the project progress. With regard to the settlement cycle, all localities mainly adopt two methods: one is to settle according...
Magnetic Thread Disc 2、 The semi-finished product processing method is an intermediate transition mode. But fortunately, the wisdom of the people is infinite, and they...
It is also a key infrastructure construction project implemented by the autonomous region and Baotou City this year. At present, the highway engineering project has...
Acquisition method 2: Click. Spherical Head Anchor Text ▼▲ data acquisition method original document acquisition method 1: share this article to the building complex (no...
Precautions during traffic control, please wait patiently for passing vehicles and pedestrians and obey the command of on-site traffic management personnel. Please understand the inconvenience...
Jinwu (hang) plot 2021-012, located in the main urban area of Yang village, Wuqing, is the core residential plot in the old urban area launched...
The scope of the red line is less, and a large section is left in the north. The setting out hole was left wrong, and...
3、 Construction process flow 1. The spacing of split screws in the middle of the beam is 400mm ~ 500mm. The elevation of the upper...
The upper and lower reinforcement of the bottom plate shall be arranged according to the principle that the stressed reinforcement is outside. 3. 3. Cushion...