Detailed explanation of construction operation standards and inspection standards of socket and turnbuckle scaffold
Knock the bolt of not less than 0.5kg with a hammer to ensure that the exposed tail of the bolt is not less than 15mm....
Knock the bolt of not less than 0.5kg with a hammer to ensure that the exposed tail of the bolt is not less than 15mm....
The temporary inconvenience is for long-term convenience. 35: (Dushi road bus station) original line ~ Jianshe Road ~ Renmin Road ~ original line. When adding,...
▶ Comprehensive benefits: free of materials and labor costs such as embedded wooden box production, secondary piping and box installation, secondary slot filling, etc., and...
If it involves the content, copyright or other issues of the work, please contact us in time, and we will correct or delete the relevant...
4. The key of frame column reinforcement binding is to control the vertical and relative position of longitudinal main reinforcement. In order to prevent missing...
(4) Using the additive method, add a chemical agent that can reduce the freezing point of water to the concrete mixture in the air temperature...
Your sharing, praise and watching are the best encouragement ↓ ↓.. Text excerpt: calculation formula} Formula 1: number of 1 cubic brick = (k *...
Erection Anchor One Sided Click me: join the member of engineering practice reference in 2022 and the member of engineering practice reference in 2021 to...
♩.. ♩.. Article 9 rights and obligations of both parties: 9.1 Party A shall notify Party B to enter the site 2 days in advance....
01 gist of the judgment: the project involved in the case is a commercial residential project. In the housing construction projects invested by the private...