Waterproof construction process standard of basement floor (I)
Large surface construction of SBS coiled material (1) if one layer of coiled material is used, the thickness shall not be less than 4mm, and...
Large surface construction of SBS coiled material (1) if one layer of coiled material is used, the thickness shall not be less than 4mm, and...
On January 2, 2022, November 29 of the lunar calendar, weather: snow shower to cloudy, temperature: – 16 / 2 ℃, northwest wind level 3,...
Construction progress: the section from Hongchun Road station to Urban Construction Institute station: ① 2# connecting channel pump house, 1 steel grating is erected (6...
From 8:00 a.m. Erection Anchor One Sided In case of a traffic accident, call the police as soon as possible, select the quick compensation method,...
Today, I recommend a book for masters who really want to learn waterproof technology: the second edition of indoor water pipe leakage detection technology, which...
3. At the lap joint of new and old coiled materials, the original coiled material interface shall be cleaned, and the lap joint can be...
The details are as follows: I. During the period of road traffic control, please follow the on-site road traffic instructions… (2) Phase II: from January...
7. After completion, it shall be reported to the quality supervision station for special acceptance. 2、 Control standards and precautions 1. (long press the QR...
Ensure the seamless connection between the construction link and the design scheme; Each inspection is only to present each design and construction standard more perfectly....
The above opinions are the application opinions, and the final approval of the urban area shall prevail. The listed plot of Huanghuagang, the central group...