Special construction scheme for external wall tile pavement
IV. (7) The construction disclosure shall be carried out in layers, and the construction technicians shall disclose to the team leader and quality supervisor, and...
IV. (7) The construction disclosure shall be carried out in layers, and the construction technicians shall disclose to the team leader and quality supervisor, and...
Firstly, the anchorage ditch should be excavated deep enough to prevent the composite membrane from sliding. If the length of the steep slope is too...
Acceptance criteria: define relevant acceptance criteria and acceptance conditions according to the construction process. 2. Construction management personnel: list of management personnel and post responsibilities...
Therefore, in order to protect urban roads, we should try to use trenchless technology. 1.2. 2.6 key points of reaming construction after the construction of...
The main leaders of relevant units of Tianyuan Group accompanied the investigation-. During the investigation, Zhao Ming inspected the construction site, listened to the project...
▼ pay attention to the construction management in Xinjiang and obtain the latest construction policies in Xinjiang. Lifting Anchor Source: the report of Xinjiang housing...
Wire Lifting Loop Generally, the protection methods can be plant protection, stone masonry protection and concrete protection Slab protection, gabion, riprap, retaining wall and other...
after sales guarantee and issuance of warranty card, Free warranty} the company provides free warranty and issues warranty cards to ensure after-sales service.. If the...
What do you think of the atlas of reinforcement plane method? What’s the security check for? How to check the mechanical equipment on the construction...
For the composite layer of precast girder, one measuring hole shall be set for each beam; j. For the slab wall of shear wall structure,...