Aluminum mold construction technical disclosure, quickly collect it!
After the step is installed, the step needs to be reinforced with back ridge. During the assembly of the first floor, the formwork shall be...
After the step is installed, the step needs to be reinforced with back ridge. During the assembly of the first floor, the formwork shall be...
Incoming and outgoing switches shall be selected according to the capacity of distribution transformer. The exposed part shall be painted with yellow and green...
on promoting the combination of permanent and temporary work in the construction process. The scheme is specially prepared to strictly plan the permanent and temporary...
Only the civil model and curtain wall model can be overlapped and integrated through BIM Technology, supplemented by review and interference feedback to relevant units...
Unfinished ~ materials. Source: copyright of Henan Wujian and Baidu Library belongs to the original author. Magnetic Box
In some projects, the horizontal joints of prefabricated sandwich exterior wall are not installed with sealant and PE rod after temporary fixation, but directly blocked...
Figure 1bim digital coordination and management platform is built. Integrated application of BIM 1.1bim + n innovation mode the project team relies on the innovative...
Connect the pile reinforcement and put it together. The horizontal reinforcement joint of the wall is not set at the place with the least stress....
5, Minsheng Road, Dongsheng Town, Zhongshan City. “Driving the world and illuminating the earth” is the company’s continuous development mission. It also undertakes LED...
(2) Xiangyun Street North to South: detour at Chongwen road and Zhenwu erhu alley in advance, and set warning signs at Qingyin Road, Chongwen Road,...