Deepening design and interspersed construction | ppt
The temperature, depth and breadth are waiting for you to pay attention to ▼ ABC safety loss prevention link – Emergency grand view training grand...
The temperature, depth and breadth are waiting for you to pay attention to ▼ ABC safety loss prevention link – Emergency grand view training grand...
2. In case of failure of electrical lines, devices and electric tools on the equipment, they shall be handed over to the electrician for...
Share every day. It’s a free subscription. Please rest assured. Note: This article. Before reading this article, please click the blue font above, and...
Share it with more family and neighbors!.. Solid Lifting Socket Cross Pin
You can master Tengzhou anytime, anywhere!.. Column Clamps Formwork After research and decision by the company, our company will no longer accept opening, construction and...
A vibrating opening shall be reserved for the step cover plate; 3. The pin hole spacing of wall formwork is 300mm, and both ends are...
The specific detour conditions are as follows (the detour schematic diagram is attached): No. The departure direction of Dongfeng station is adjusted as follows: Dongfeng...
2. (5) 2 points will be given if the prefabricated building area is 5000 ㎡ ≤ the building area is less than 10000 ㎡; 4...
Education experience: from September 2016 to June 2019, I have completed the junior college. Education experience: from September 2004 to July 2008, I have completed...
How can we find out the underground situation? At this time, we have to rely on engineering geological survey. The upper soft and lower hard...