Base course treatment and construction method of elastic coating — as built drawing of EPS line coating, real stone paint, water in sand drawing, deepening design, grid and joint effect drawing
The putty layer shall be constructed in L one time: the bottom layer mainly plays the role of preliminary leveling . The surface treatment of...