From October 10! Closed construction for 3 months!

  On October 3, 2021, the traffic police brigade of Anyi County Public Security Bureau built Changbu bridge (xiajiabu bridge) on Anyi Changxian highway in 1992.

The proposed bridge beam of Changbu bridge is a 3-16m prestressed reinforced concrete hollow slab bridge, with a total length of 53.06m and a full width of 10m.

During the closed construction period, the passing vehicles and the people along the line shall choose the route in advance, pay attention to the warning signs, and inform each other.

Magnetic Box

The total budget amount is 3.8856 million yuan , the construction and installation cost is 3.199 million yuan.

The transverse arrangement is a 9-meter clear width carriageway plus 2 * 0.5m crash barrier.

Because the construction structure was relatively simple at that time and the bridge deck and bridge main body were damaged to varying degrees after years of use, in March 2021, the county Transportation Bureau invited a third-party inspection agency to conduct a comprehensive safety and quality inspection on the bridge, and finally rated it as a class IV Bridge (dangerous bridge) Considering that the highway and Bridge undertake the main agricultural and economic industries of Changbu town and Dinghu town and the travel safety of the people along the line, it is urgent to dismantle, reconstruct and transform the bridge.

Please click the blue word above to see more!    Attention! Attention! Due to the construction needs of the dangerous bridge (xiajiabu bridge) reconstruction project of Anyi Changbu County Road, in order to ensure the traffic safety and smooth development of the project during the construction period, the Anyi Changbu County Road (old lower section) will be closed from October 10, 2021 to January 10, 2022.

Source: Anyi traffic police and Anyi county financial media center 👇 click.

According to the requirements of the Work Department of the county government, Anyi Changbu County Road (old lower section) The closed construction time is adjusted from October 1, 2021 to January 20, 2022 to October 10, 2021 to January 10, 2022.

Please understand the inconvenience caused by the road closure.