Skip to content
Skip to content

China Scaffolding News

【 Daily Learning 】 Common Problems in Scaffolding Construction and Precautions for Safe Demolition

Posted on October 19, 2024 by China Scaffolding Manufacturer Blog

1.

ringlock scaffolding system ledger end

Failure to prepare a special construction plan for external scaffolding or failure to review, approve, or apply the special plan in accordance with regulations.

Tagsscaffolding

Yunnan plastic runway, Yunnan plastic runway construction

Safety Technical Disclosure for Suspended Scaffolding Operations

A fire broke out on the scaffold of a community in Shanghai, and the open fire jumped to the sixth floor! Official Bulletin

Xuyangang inspected on duty at the Dragon Boat Festival, epidemic prevention and control, and air pollution prevention and control at

Fully closed construction for more than three months! Need to detour!

The main body of 180000 built this small two-story villa for my parents. The construction team praised me for my filial piety

Complete construction scheme of waterborne floor coating

Shanghai: closed construction on March 11

Post navigation

Introduction to the latest construction technology of buckle type scaffolding (Part 2)
Guidelines for the Preparation of Special Construction Plans for Scaffolding Engineering in Safety Production Classroom (106)

Recent Posts

  • Key points for the construction of China Construction’s cantilever scaffolding scheme (page 107)
  • Construction Plan for Suspended Scaffold (Download if needed)
  • [Hidden Danger Investigation] Scaffold Hidden Danger Investigation Atlas (II)
  • Comparison of Four Common Scaffolding Technologies: Fastener type, Bowl type, Socket type Plate type, and Straight insertion type Plate
  • Interpretation of the Specification for Fastener type Steel Pipe Scaffolding (Part 1)

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News