Requirements and safety management for the installation of fastener type scaffolding in construction, a 154 page PPT can be downloaded!

1.

mason frame scaffolding

In order to prevent collapse of external scaffolding and ensure construction safety, all construction plans for external scaffolding must be reviewed and approved by the engineering bureau (for larger projects) or the company before construction.

For floor standing scaffolding that reaches or exceeds 50 meters, cantilever scaffolding that reaches or exceeds 20 meters, and other scaffolding with high risks, the plan must be reviewed and approved after expert argumentation.

At the same time, it is necessary to draw effective construction drawings.

Should comply with the current industry standard “Safety Technical Specification for Steel Pipe Scaffolding with Fasteners in Construction” JGJ130-2011.

Leave a Reply

Your email address will not be published. Required fields are marked *