1.
Basic protection: A base and cushion plate should be set at the bottom of the scaffold pole, with a thickness of not less than 50mm and a length of not less than 2m.
The foundation should be flat and compacted to prevent settlement; When encountering water accumulation or soft soil layers, reinforcement measures such as hardening and pile driving should be taken.
.


