Construction scaffolding, formwork support, and safety for high-altitude operations

Before setting up the scaffold, the foundation should be treated according to the plan to ensure bearing capacity and drainage, and cushion plates, bases, and longitudinal and transverse sweeping rods should be set up.

The spacing between poles, step distance, and height of the frame shall comply with the design, and the bottom shall not be suspended or accumulate water.

The erection of the frame shall be checked synchronously with the construction.

In case of softening settlement, obvious deformation, loose or overloaded members, the use shall be immediately stopped, unloaded, reinforced and accepted.