The height of single row scaffolding shall not exceed 24m; for double row floor standing scaffolding with a height ≥ 24m, a special construction plan must be prepared, and the design and calculation of the foundation and connecting wall components must be done well, and the review and approval procedures must be carried out.
If the height of the landing scaffold exceeds 50m, segmented reinforcement measures must be taken, and a special plan must be organized for expert review.
.



