The attached lifting scaffold is a highly dangerous sub item project, and its risk source does not lie in the fact that the scaffold itself cannot be erected, but in the multiple dynamic processes, multiple responsibility interfaces, and concentrated failure consequences.
The current management emphasizes the “integrated” model: property rights (production), installation, lifting, dismantling, and maintenance should be undertaken by the same unit with professional contracting qualifications for template scaffolding, to avoid the responsibility vacuum caused by the separation of equipment and operations.
.