Last autumn on a project, I stood downstairs and looked up.
A six story high scaffolding looked neat from afar.
I went up and walked around, and when I came down, I called the production manager.
He asked me what was wrong, and I said you go up and take a look at those wall connecting pieces on the east side of the third floor – two of them were tied with wire, and one was simply dismantled without being installed, leaving a large gap between the frame and the structure.
The production manager went up and finished reading it, and his face turned pale.
That afternoon, the entire eastern scaffolding was suspended for rectification.
.