Skip to content
Skip to content

China Scaffolding News

13 common quality problems in prefabricated construction

Posted on April 2, 2022 by China Scaffolding Manufacturer Blog

Magnet Recess Former

Prefabricated building has become a national policy in hot implementation, but for prefabricated construction, most projects encounter many problems in the process of on-site implementation due to lack of experience..

Tagsscaffolding

Supreme law: how to distinguish between affiliated relationship and subcontracting relationship in engineering construction

Water cut-off notice! The water supply will be cut off during the disinfection construction of the main water pipe of Shibazi water plant

The moon Jae in the house, stepped up construction.

[@ owner!] The construction enclosure of Donghe bridge head has been completely removed!

Official announcement: without qualification certificate and safety permit, it is not allowed to undertake construction labor operation!

Two major preparations should be made before decoration construction

20 common problems and solutions of real stone paint construction

Basement waterproof construction in this way, no leakage!

Post navigation

How to construct “mass concrete”? Please refer to the seven measures!
Dry goods: Graphic explanation of standardized construction of Expressway Subgrade

Recent Posts

  • Tips for Safety Control of Suspended Scaffolds: Detailed Explanation and Practical Guide to Nine Core Chapters
  • All 5 common problems with the on-site scaffolding were found to be in violation, and upon inspection, the work was immediately suspended!
  • How to inspect the U-shaped ring of scaffolding I-beam, just look at these 4 points
  • Regulations that should be followed for the installation of floor standing scaffolding
  • Guidelines for the Preparation of Special Construction Plans for Sub projects with High Risks (Part 3) Scaffolding Engineering

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News