Hazard Investigation 25: Set up scaffolding, use equipment pipelines, guardrails, etc. as scaffolding support points or load-bearing poles

Hazard Investigation 25: Set up scaffolding, use equipment pipelines, guardrails, etc.

mason frame scaffolding

as scaffolding support points or load-bearing poles (attached with on-site photos and standards of scaffolding hazards).