1.
Single and double row scaffolding must be erected in accordance with the construction schedule, and the height of one erection should not exceed two steps above the adjacent wall connecting components; If it is not possible to set up connecting wall components beyond two adjacent steps, measures such as bracing and fixing should be taken to tie them to the building structure.
.