Skip to content
Skip to content

China Scaffolding News

Deep Analysis of Fastener Scaffolding: From Scratch to Mastery, Understanding Fastener Scaffolding in One Text

Posted on June 24, 2025 by China Scaffolding Manufacturer Blog

Scaffold steel pipes should use 48.

shuttering props

3X3.

6 steel pipes.

The maximum mass of each steel pipe should not exceed 25.

8kg.

.

Tagsscaffolding

Construction technology optimization of China Construction Third Engineering Bureau

What is the process of handling construction labor qualification in Guiyang?

The latest release – case of falling accident at construction site III: falling of scaffold

Grade II constructor’s question bank of construction project construction management [real questions over the years + question bank] PDF

【 Xue’an Hall 】 | “Safety Standards for Prevention and Control of Construction Accidents” – High Altitude Falling Topic 02: Scaffolding

Looking for: design, construction, business, welder and apprentice

Accounting training course of construction enterprises (with courseware)

End construction method of round steel support

Post navigation

Key points of safety management for the installation and dismantling of steel pipe fastener scaffolding
Construction plan for buckle type cantilever scaffold (in accordance with JGJ/T231-2021) 2022 Word 100 pages (editable, downloadable)

Recent Posts

  • Safe use and management of attached lifting scaffolding
  • Dry goods | Blood spitting treatment! Scaffold safety management training materials, please take them from the end of the article!
  • How to be as stable as flat ground at a height of 100 meters? Please keep this integrated all steel lifting scaffold safety construction
  • Portal Scaffold Special Plan P23, Word version, downloadable
  • Technical Code for Safety of Steel Pipe Scaffolding with Fasteners in Construction JGJ130 General Code for Construction Scaffolding GB55023-

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News