Scaffold steel pipes should use 48.
3X3.
6 steel pipes.
The maximum mass of each steel pipe should not exceed 25.
8kg.
.
Scaffold steel pipes should use 48.
3X3.
6 steel pipes.
The maximum mass of each steel pipe should not exceed 25.
8kg.
.