China Construction Scaffolding Scheme (Formal) (18P)

The eaves heights of the buildings in this project are 15.

95m for the north and south auxiliary buildings, and 40.

70m for the main building.

The first floor is 5.

3m high, the second to seventh floors are 4.

8m high, and the top floor is 4.

2m high.

The outdoor natural floor elevation of the construction site is -3.

50m, and the foundation bearing capacity is 120kn/m2.

combination plate nut

The plan shape of the project is irregular, with no fixed standard layer, and the facade has overhanging and shrinking platforms, making scaffolding construction difficult.

.