Technical Director 3D Scheme External Scaffolding Engineering Construction Plan (Template) Technical Bid

According to the project overview and structural form, the external protective frame of this project adopts floor standing scaffolding and cantilever frame forms.

The spacing between the single-sided frame uprights is evenly distributed according to the structural plane dimensions, with a spacing of no more than 1.

5m, a horizontal spacing of 0.

9m, and a step spacing of 1.

prop sleeve

8m.

The wall connecting components are set in two steps and three spans to ensure that the distance between the inner row of the facade curtain wall construction and the outer edge of the building is 0.

45m.

The cantilever height of each section of the cantilever frame does not exceed 20m.

The specific installation height and cantilever section layout of the external scaffolding are shown in the following chart:.