The 4 most easily overlooked details in scaffolding construction, thoroughly understood and no longer criticized by supervisors

This scaffold seems to be well constructed, but there are actually four problems.

formwork tie rod

The first one is that the height of the sweeping rod above the ground is too high, and it has been measured to be 400mm.

.