Skip to content
Skip to content

China Scaffolding News

Eldest son heating project construction site, to ensure early and stable heating!

Posted on July 3, 2021 by China Scaffolding Manufacturer Blog

Source: financial media center of Changzi county.

.

Tagsscaffolding

XCMG road construction observation meeting successfully held

Chinese construction team entering the site, preparing to remove the exterior wall signage of the original US consulate

Go straight to the scene! The subway construction road collapsed, two cars fell in, three people lost contact, including a father and son,

Fully enclosed construction of Chongwen East Road in Wan’an County

Xiangcheng construction general contractor

Prefabricated bridge construction, from the pier to the cable tower, a full done!

Precautions and common disputes in signing and performing construction contracts of construction projects

The old electrician broke out 9 hydropower construction standards, telling the truth every word

Post navigation

On May 15, the construction ceremony of Hesheng square was held, and the surprise award was presented to the whole city!
Worry! Baiyun District is too close to the subway construction, which leads to the cracking of the wall, the falling off of the outer wall, and the dangerous housing

Recent Posts

  • Scaffold: I didn’t provoke anyone, but I was laughing hysterically
  • Code of practice for the installation and use of buckle type scaffolding!
  • Housing and Urban Rural Development Bureau: All newly started projects must use fully enclosed steel plate safety nets! The official release
  • Who signs for scaffold acceptance, what is inspected, and how are traces left? Key points of whole process control!
  • Key points of traditional cantilever scaffold construction – layout of special parts

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News