Skip to content
Skip to content

China Scaffolding News

Code for construction and acceptance of busbar devices in electrical equipment installation engineering (gb50149-2010)

Posted on October 6, 2021 by China Scaffolding Manufacturer Blog

Code for construction and acceptance of busbar devices in electrical equipment installation engineering (gb50149-2010)..

Formwork Cone

Tagsscaffolding

Shuangfeng closed construction here! Detour!

Key points for controlling the installation of scaffolding ancillary facilities

From tomorrow onwards, closed construction for 6 months!

General contracting project of medical complex building project of Longgang District Hospital of traditional Chinese medicine (Lot 2)

What else can a constructor do besides project construction?

generally known! Closed construction of Kaiping section I for one month

Notice on closure construction of Shengli Road (Minfeng South Road Yongxing Road) in Kenli District

From September 1, the bid registration will be cancelled! Two new construction policies have been implemented!

Post navigation

The construction of 72 bored piles of friendship road Sanhe bridge project is over! It is expected to be put into operation at the end of
Code for construction and acceptance of panel, cabinet and secondary circuit wiring of electrical equipment installation engineering

Recent Posts

  • Safety management of installation and dismantling of construction scaffolding
  • How to set up scaffolding safely and compliantly? Practical Construction Manual for Scaffolding
  • 27 Notes on Construction Safety | Chapter 6, Section 1 Scaffolding Safety Technology
  • What should be checked for scaffold acceptance? Sign after checking all 10 items, don’t miss any of them
  • The example diagram of scaffolding construction is understandable to laymen!

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News