Skip to content
Skip to content

China Scaffolding News

Code for construction and acceptance of busbar devices in electrical equipment installation engineering (gb50149-2010)

Posted on October 6, 2021 by China Scaffolding Manufacturer Blog

Code for construction and acceptance of busbar devices in electrical equipment installation engineering (gb50149-2010)..

Formwork Cone

Tagsscaffolding

Pingyao Dongguan Street road excavation construction!

Pay attention to the construction rules of gypsum based self leveling

newest! The construction of this subway station has been started, and LV Peng conducted on-site investigation

Shehong: multi site closed construction!

From 8:00 on April 16, this section of Wuhe expressway will be closed for construction!

[scaffolding] about scaffolding, you see, this is enough!

The gantry crane at the construction site of Shenzhen Metro Line 20 collapsed, resulting in 2 deaths and 6 injuries

This section of Changchun has been closed for construction for one month!

Post navigation

The construction of 72 bored piles of friendship road Sanhe bridge project is over! It is expected to be put into operation at the end of
Code for construction and acceptance of panel, cabinet and secondary circuit wiring of electrical equipment installation engineering

Recent Posts

  • Tips for Safety Control of Suspended Scaffolds: Detailed Explanation and Practical Guide to Nine Core Chapters
  • All 5 common problems with the on-site scaffolding were found to be in violation, and upon inspection, the work was immediately suspended!
  • How to inspect the U-shaped ring of scaffolding I-beam, just look at these 4 points
  • Regulations that should be followed for the installation of floor standing scaffolding
  • Guidelines for the Preparation of Special Construction Plans for Sub projects with High Risks (Part 3) Scaffolding Engineering

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News