Heartache! I. The construction personnel accidentally touch the high-voltage power –
The specific cause of the accident is subject to the official release. Click the electrician and electrical study above to pay attention to and star...
The specific cause of the accident is subject to the official release. Click the electrician and electrical study above to pay attention to and star...
Please click the blue word above to see more! Xiaobo learned from the municipal utility service center that the Jian’an Road Tunnel will be fully...
Mobile phone: 13970975935 directory 1. 2 big data analysis of construction contract disputes of Jiangxi Provincial High Court construction contract disputes of construction projects show...
Safety protection (1) whether the scaffold board is fully paved between the platform and the building structure; (2) whether the three side protection settings of...
3 design change has potential claim opportunities 25) loss of manpower, materials and funds, work stoppage, delay in construction period, repair and reinforcement, overstock of...
2) the pressure groove treatment at the connection between the inner wall plate and the structure is convenient to hang the net and prevent cracking....
Generally speaking, the size of the range of water collecting wells largely depends on the actual water output of the pump. It should be noted,...
At that time, the traffic capacity of this section will be greatly reduced. Click 「 below 」. The figure shows the detour lines from south...
The temperature, depth and breadth are waiting for you to pay attention to ▼ ABC safety loss prevention link – Emergency grand view training grand...
2. In case of failure of electrical lines, devices and electric tools on the equipment, they shall be handed over to the electrician for...