Skip to content
Skip to content

China Scaffolding News

Code for construction and acceptance of electronic information system room (gb50462-2008)

Posted on October 6, 2021 by China Scaffolding Manufacturer Blog

Code for construction and acceptance of electronic information system room (gb50462-2008)..

Foot Mounted Anchor

Tagsscaffolding

Publicity! About the construction and reconstruction of shanty towns in Jiaozhou!

Linyi night road occupation operation, construction noise disturbing residents… Continuous rectification!

Destroy the body? Jieyang village construction team destroyed the ancestral graves of villagers, leaving only two or three bones

New town construction section detour strategy( (with adjustment of multiple bus lines)

Final judgment: scaffold collapse caused 2 deaths and 1 injury! The labor team leader was sentenced! This is the price of illegal construction!

Housing and Urban Rural Development Bureau: the construction period of concrete main structure shall not be less than 5 days / floor! The

Foshan Housing and Urban Rural Development: Issuing Notice on the Special Rectification Work Plan for Construction Scaffolding in Foshan

Lawa Project Department of Chengdu Branch of China anergy Third Engineering Bureau made a big contribution to the national day

Post navigation

Earthwork construction and quality control
The most complete construction scheme of silicon Pu Stadium

Recent Posts

  • What are the contents of scaffolding in building construction projects? How to check?
  • High Definition Atlas of Scaffolding Hazards (13): Scaffolding Pole and Template Support Not Independently Erected
  • Don’t understand suspended scaffolding? Understand the key points of the 107 page plan thoroughly!
  • [V&V Practical] Scaffolding Safety Installation
  • One time explain the socket type buckle bracket, it is recommended to save it!

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News