The outer diameter of the steel pipe should be 48-51mm, and the wall thickness should be 3-3 Steel pipes with severe corrosion, bending, or cracks of 5mm should not be used.

scaffolding adjustable base jack

.

Tagsscaffolding

Technical training for stringing construction of transmission line project

GB 55023-2022 General Specification for Construction Scaffolding

Wenshui professional decoration design network Club_ Gymnasium decoration construction

Look! Baoji Railway Station reconstruction construction, these passenger trains have changed

Construction until the end of the year! Detour!

Application of Dajiang aerial survey UAV in earthwork engineering survey and construction site management

Notice on fully closed construction of Yulin Sangzhuang section of Dengxin Road, Dengzhou City

Common sense and common problems of temporary electricity use in construction site

Post navigation

Guidelines for the Preparation of Special Construction Plans for Scaffolding Engineering
Guangzhou uneven aluminum alloy scaffold

Recent Posts

  • Scaffold: I didn’t provoke anyone, but I was laughing hysterically
  • Code of practice for the installation and use of buckle type scaffolding!
  • Housing and Urban Rural Development Bureau: All newly started projects must use fully enclosed steel plate safety nets! The official release
  • Who signs for scaffold acceptance, what is inspected, and how are traces left? Key points of whole process control!
  • Key points of traditional cantilever scaffold construction – layout of special parts

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News