Skip to content
Skip to content

China Scaffolding News

3 common problems in scaffolding construction and safety precautions for dismantling

Posted on October 2, 2024 by China Scaffolding Manufacturer Blog

1.

climbing cone

Failure to prepare a special construction plan for external scaffolding or failure to review, approve, or apply the special plan in accordance with regulations.

Tagsscaffolding

Notice on practical operation assessment of special construction operators (No. 29, 2021)

Break up! The road in Qinhuangdao was closed for 8 months

CSCEC has 15 excellent construction manuals (reinforcement, formwork, concrete, electrical, waterproof, etc.), which can be downloaded and

Raft reinforcement construction three-dimensional diagram (in line with 16g101), read will learn!

Key points of plant landscaping construction, value-added dry goods!

newest! Exposure of the construction progress of Puning Bus Terminal

NA

Urban road construction notice!

Post navigation

Certification training for high-altitude operations in Yuxi City: safety training on scaffolding
Housing and Urban Rural Development Bureau: Starting from October 1st, both formwork support and scaffolding work should be included in

Recent Posts

  • Summary of key points for scaffold acceptance, with 4 high-frequency hazards explained in one go
  • Hidden danger identification ・ Take the case as a reference | Formwork and scaffold works – scaffold works (cross bracing and horizontal
  • JGJT231-2021.pdf Safety Technical Specification for Socket type Slot type Steel Pipe Scaffolding in Construction
  • Interpretation of Safety Regulations for Steel Pipe Scaffolds with Type A: Construction Requirements for Diagonal Ladders, Foundations, and
  • Interpretation of Safety Regulations for Steel Pipe Scaffolds: Construction Preparation, Foundation and Base for Erection and Demolition

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News