Skip to content
Skip to content

China Scaffolding News

3 common problems in scaffolding construction and safety precautions for dismantling

Posted on October 2, 2024 by China Scaffolding Manufacturer Blog

1.

climbing cone

Failure to prepare a special construction plan for external scaffolding or failure to review, approve, or apply the special plan in accordance with regulations.

Tagsscaffolding

Closed construction, please detour!

The mysterious use of scaffolding! You know what?

Why are the construction project managers divided into two?

What should be paid attention to in epoxy floor construction when the temperature is low?

How to become an excellent weak current construction team? What are the methods?

Construction daily report of work area 1 of Lot 1 of Fuzhou Binhai Express

Project construction daily report of civil construction area 06 of phase I project of Zhengzhou rail transit line 7

A scene taken at the construction site of Wuyi Road in Linfen

Post navigation

Certification training for high-altitude operations in Yuxi City: safety training on scaffolding
Housing and Urban Rural Development Bureau: Starting from October 1st, both formwork support and scaffolding work should be included in

Recent Posts

  • What are the contents of scaffolding in building construction projects? How to check?
  • High Definition Atlas of Scaffolding Hazards (13): Scaffolding Pole and Template Support Not Independently Erected
  • Don’t understand suspended scaffolding? Understand the key points of the 107 page plan thoroughly!
  • [V&V Practical] Scaffolding Safety Installation
  • One time explain the socket type buckle bracket, it is recommended to save it!

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News