Skip to content
Skip to content

China Scaffolding News

JGJ 130-2001 “Technical Code for Safety of Steel Pipe Scaffolding with Fasteners in Construction” Implementation on June 1, 2001

Posted on January 5, 2025 by China Scaffolding Manufacturer Blog

Network resources, supporting genuine versions.

shuttering prop nut

If there is any infringement, please contact us for removal.

Tagsscaffolding

Construction is basically completed! Bengbu first

be careful! Construction of Xuzhou Huozhou Expressway G30

The internal contract of construction enterprise is valid, and taxes, management fees and other expenses shall be deducted from the project

be careful! The exit of Guangyuan No. 1 expressway toll station is closed for 35 days. Vehicles at the next station need to bypass!

Special training on common risks and prevention of construction contract

The construction of the project should be carried out in time and at night

From now on! Take a detour

The safety management disclosure of large-scale deep foundation pit construction is right to start from these aspects!

Post navigation

Do you really understand the secrets in the specifications for the connection inside and outside scaffolding?
[West Supply Classroom] Safety Prevention and Control of Scaffolding Construction Operations

Recent Posts

  • Super thin walled steel pipe scaffold – promoting the innovation of outer frame construction
  • Technical Code for Safety of Wooden Scaffolding in Construction JGJ164-2008.0df
  • Fastener type steel pipe scaffolding for daily safety hazard identification
  • Structural composition and design principles of buckle type scaffolding
  • Test Point for the First Construction Examination: Several Technical Points of Scaffolding Engineering Construction Plan (Part 1)

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2025 China Scaffolding News