Skip to content
Skip to content

China Scaffolding News

Comparison of the old and new specifications for socket type buckle steel pipe scaffolding (JGJ231-2010 vs. JGJ/T231-2021) with the attached

Posted on March 5, 2025 by China Scaffolding Manufacturer Blog

2.

scaffolding walk boards

Standardization | The latest policy summary of the Ministry of Housing and Urban Rural Development in 2023, the most comprehensive in history!.

Tagsscaffolding

Elevator protective door manufacturer @ construction elevator protective door manufacturer

Taicang decoration construction team telephone?

In the field of construction engineering, we often hear the term “full scaffolding”. So, what does it actually mean? Today, we will provide

Suddenly! A scaffold collapsed at a construction site in Foshan City, fortunately there were no casualties

Problems and Countermeasures in the construction of government invested construction projects

Guangzhou uneven aluminum alloy scaffold

Warning: scaffold collapse caused 8 deaths and 1 injury, 5 public officials were investigated!

【 Document News 】 Department of Housing and Urban Rural Development: Starting from July 1st, the use of wheel buckle scaffolding is

Post navigation

100 essential solutions for technical leaders: Special construction plan for attaching lifting scaffolding safety!
Complete Analysis of the Specification for Essential Formwork and Scaffolding in Construction

Recent Posts

  • Super thin walled steel pipe scaffold – promoting the innovation of outer frame construction
  • Technical Code for Safety of Wooden Scaffolding in Construction JGJ164-2008.0df
  • Fastener type steel pipe scaffolding for daily safety hazard identification
  • Structural composition and design principles of buckle type scaffolding
  • Test Point for the First Construction Examination: Several Technical Points of Scaffolding Engineering Construction Plan (Part 1)

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2025 China Scaffolding News