Skip to content
Skip to content

China Scaffolding News

Construction method of external scaffolding for building construction

Posted on March 24, 2025 by China Scaffolding Manufacturer Blog

1.

cuplock scaffolding bottom cup

The scaffold steel pipe adopts a diameter of 48mm and a wall thickness of 3.

5mm; The maximum length of the horizontal bar is 2200mm, the maximum length of other bars is 6500mm, and the maximum mass of each steel pipe should not exceed 25kg.

.

Tagsscaffolding

Construction technology | the project managers of the three bid sections are not on duty! Several projects have been included in typical

【 Yudian Classroom 】 Safety Management Regulations for Scaffolding Operations

Safety Technical Disclosure for Suspended Scaffolding Operations

Construction standard of electromechanical installation engineering

On October 28, Taiyuan closed for construction at night!

be careful! For 21 days, Taiyuan belt expressway has been constructed

Construction safety responsibility agreement

Construction technology | did you “roll over” at the construction site?

Post navigation

High altitude operation | Preventive measures for scaffold collapse
JZ189 Phase -3 sets of famous enterprise flower basket style new cantilever scaffolding construction plan with CAD drawings attached

Recent Posts

  • Supervision Tips | Complete Implementation Rules for Scaffolding Engineering Supervision
  • Central safety assessment and inspection exposed major hidden dangers in scaffolding of a project in Xinjiang. It is essential to grasp
  • How to inspect the suspended scaffolding with flower baskets?
  • National Standard GB51210-2016 | Comprehensive Analysis of the Unified Safety Standard for Scaffolding
  • The key points for the acceptance of scaffolding wall connecting components only need to look at these 3 points

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News