Skip to content
Skip to content

China Scaffolding News

Mastering various scaffold calculation methods makes budgeting simple

Posted on April 5, 2025 by China Scaffolding Manufacturer Blog

(1) When calculating the internal and external wall scaffolding, the area occupied by door and window openings, hollow ring openings, etc.

shoring prop nut

is not deducted.

.

Tagsscaffolding

Start construction bidding for Chongqing east station section of Chongqing Hunan high speed railway and related projects

Liuzhou construction site was suddenly stopped because

Construction notice! It is expected to resume in April next year!

Code for embedded construction of wire pipe

Take it seriously! A construction unit has been notified for recruiting men aged 60 and above to engage in construction work! Immediate

Construction plan for secondary structure scaffolding

Video interpretation of JGJ/T 231-2021 “Safety Technical Standard for Socket type Steel Pipe Scaffolding in Construction”

To create a first-class construction, Jianggan urban management opened the “six actions” to create a “safe municipal”

Post navigation

Construction methods for scaffolding erection and dismantling
2023 Elevator Shaft Scaffolding Special Construction Plan Word 65 page (editable and downloadable)

Recent Posts

  • Key points for the construction of China Construction’s cantilever scaffolding scheme (page 107)
  • Construction Plan for Suspended Scaffold (Download if needed)
  • [Hidden Danger Investigation] Scaffold Hidden Danger Investigation Atlas (II)
  • Comparison of Four Common Scaffolding Technologies: Fastener type, Bowl type, Socket type Plate type, and Straight insertion type Plate
  • Interpretation of the Specification for Fastener type Steel Pipe Scaffolding (Part 1)

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News