In order to ensure construction safety, meet construction progress, and avoid fires and incidents of falling objects causing injury or damage, according to the specific situation of the project, E1 #, E2 #, and E4 # plan to use the DM300 fireproof fully protected intelligent lifting platform as the external protective frame for the standard floor of the building, while E5 #, E6 #, and B1 # plan to use the LG300 fireproof fully protected intelligent lifting platform as the external protective frame for the standard floor of the building.
The climbing frame lifting and lowering meet the structural protection requirements for the main construction.
.