【 Engineering Knowledge 】 Common Construction Site Frame Safety Standardization Inspection (Part 1)

The foundation of the upright pole is flat and compacted, and the concrete has hardened by ≥ 100mm.

The bottom of the upright pole is equipped with a 50mm thick wooden pad and a standard steel base, which covers ≥ 2 spans of the upright pole; The frame is surrounded by drainage ditches with a width of 200mm and a depth of 150mm, sloping towards the collection well; Install a continuous water barrier of ≥ 100mm on the outer side.

shuttering prop nut

.

Leave a Reply

Your email address will not be published. Required fields are marked *