Skip to content
Skip to content

China Scaffolding News

Technical code for safety of high altitude operation in building construction jgj80-2016

Posted on January 20, 2022 by China Scaffolding Manufacturer Blog

Technical code for safety of high altitude operation in building construction   JGJ80-2016 official account reply: safety 10..

Two Hole Anchor

Tagsscaffolding

Emergency popular science | illustration: safety tips for building construction in winter

3 minutes to understand the requirements for setting up bowl buckle scaffolding

There is no construction on the construction site. It is blocked every day in the morning peak! What’s the matter with Guiyang road?

Supreme People’s Court: “the construction party that has been withdrawn” has the right to claim the project payment for the part that has been constructed, without the completion and acceptance of the whole project!

Several problems needing attention in summer construction

see the scene which is dreadful to one ‘s mind! The surveillance recorded such a scene

Road construction | Taiyu auxiliary road closed construction from April 29

The bridge construction section collapsed and 5 people lost contact!

Post navigation

Construction bidding! A new hospital will be built in Changsha, with a construction period of 1080 days
Work safety report of Baihetan Construction Bureau in November 2021

Recent Posts

  • How to choose wholesale of portal scaffolding? Purchase price, specifications, and accessories precautions
  • Diagram of Safety Inspection Points for Fastener type Steel Pipe Scaffolding
  • Scaffolding Engineering in Construction Standardization Practices
  • How much does a set of portal scaffolding cost? Procurement quotation, accessories and selection guide
  • Training on Operation Requirements and Safety Management for China Construction Scaffolding Engineering

Recent Comments

  • A WordPress Commenter on Hello world!

Copyright © 2026 China Scaffolding News